Moving My VCF 9 Lab to Six Minisforum MS-A2 PCs

HOMELAB JOURNAL

Moving My VCF 9 Lab to Six Minisforum MS-A2 PCs

Explore a move to six Minisforum MS-A2 PCs for a VCF homelab, with separate management and workload hosts, memory choices and rack layout.

Historical hardware snapshot

This post records November 2025. For the later seven-system MS-A2 design and revised network, see the September 2026 homelab architecture. Use the VCF lab guide index to choose a deployment walkthrough.

Overview

I moved my VCF 9 homelab to six Minisforum MS-A2 PCs as a deliberate redesign of the lab. My previous hardware could support VCF 9 when paired with NVMe storage, so this was not a compatibility-driven replacement or a tradeoff between an unsupported platform and a supported one. I wanted to build around the compact MS-A2 platform while following William Lam’s published VCF 9 work with Minisforum systems. This update records the models, host roles, memory choices and rack layout I planned for the change.

Hardware choices and roles

In November 2025, I purchased the following systems for the lab redesign:

(Qty 3)
MS-A2 AMD Ryzen 9 7940HX with Radeon Graphics
Purpose: VCF 9 management domain
(Qty 3)
MS-A2 AMD Ryzen 9 9955HX with Radeon Graphics
Purpose: VCF9 workload domain, Kubernetes and possible Private AI

Memory and deployment plans

The design follows William Lam’s VCF on Minisforum MS-A2 guidance and his VCF 9 in a Box build for the most part. I am only putting 96GB of RAM in my workload hosts, due mostly to the increased cost of DDR5-5600 SODIMM memory. ESXi memory tiering also gives me additional flexibility for this lab allocation.

Rack layout and progress

At the time of this November 2025 update, the MS-A2 7940HX systems were installed in the rack and running VCF 9. The MS-A2 9955HX systems had not yet arrived.

Here is the new layout, been using my 3d printer a ton lately to print out mounts for this setup.

Homelab rack with compact PCs in mounts above larger servers and storage equipment, with management and workload host labels.

This post records the initial six-system transition. The later September 2026 architecture update documents four management hosts, three GPU-equipped workload hosts and the revised network.